Introduction
Gas to Gas Heat Exchanger (GGH) is a
heat exchanger device in which heat is transferred from the high temperature
untreated flue gas to the treated low temperature flue gas.
Main Function
of GGH is to transfer the heat from raw flue gas to outlet clean gas from
absorber. GGH is used in the coal power plant
mainly for the purpose of reducing the SO2 from exhaust Flue Gas.
The
working principle of GGH heat exchanger is slowly rotating rotor filled with
heating elements (Baskets) which transfer heat between two gas flows. The hot
gas flow to be cooled down has to be in counter flow with the cold gas to be
heated up.
- GGH is set with two electric drive units with one for main drive and the other for standby.
- Rotor is of counter flow bisector type. Rotor Fan bearings are oil grease lubricated. Motor Rotor bearings are sealed cooled by seal air fan.
- There are two bearing cooling fans to cool the fan bearings as bearing are located in top and bottom side. Motor has air cooled winding system.
- There are two LRSB in GGH top side and bottom side. Soot blowing using steam or water or compressor air.
- Two low leakage fans are in GGH one for main and another one is stand by. Purpose of low leakage fan is to seal the raw flue gas leakage from the Sector plate by clean flue gas.
GGH Design Description
On one side, GGH takes in the hot untreated flue gas and passes this flue gas into FGD system. Whereas on the other side there will be flow of treated flue gas and then passes into the Absorber. In the GGH, there will be heat transfer from the hot untreated flue gas to the treated flue gas. This will decrease the temperature of untreated hot flue gas below the dew point of sulfuric acid which results in condensation of sulfuric acid and consequently SO2 can be removed at FGD by the treatment of injected compounds such as limestone.
Pre Start-Up Checks:
- All manholes in raw flue gas, clean flue gas path, are in closed condition.
- LRSB top and bottom need to be checked.
- GGH Gear box oil level and bearings oil levels are Normal.
- Rotor shaft bearing cooling fan (A, B) power supply is ON.
- Low leakage fan (A,B) Power supply is ON
Starting permissive of GGH:
- GGH main motor breaker control supply is in healthy condition.
- No trip indication in breaker control panel.
- FGD raw and clean flue gas damper are closed.
- GGH rotor stalling alarm to be checked
- Lube oil for gear box and support bearing to be checked
- All man holes to be closed.
GGH Sequence start up procedure:
- Ensure FGD raw and clean flue gas damper are closed, the standby motor is stopped, start the GGH sealing fan
- Open the seal air valves /dampers to the rotor seal and sector plate seal portions from the Seal air fans and Low leakage fans
- Start the main seal air fan and put another fan as a standby mode
- Start the GGH main motor VFD until the normal RPM delaying for 60s, start the rotor parking alarm system and check the direction of rotation
- The rotor runs at the normal revolving speed of main drive motor open the FGD raw and clean flue gas dampers
- The low-leakage fan inlet and outlet dampers are closed, start the main low-leakage fan keep the standby low-leakage fan stopped, close the standby low-leakage fan inlet and outlet dampers, Open the main low-leakage fan inlet and outlet dampers.
- Open the sealing valves for soot blower
- Start the LRSB soot blowers sequence with air compressor.
GGH running Maintenance checks:
- Check the drive gear box lube oil level.
- Check the bearing shaft cooling fan running condition.
- Check the low leak fan running condition.
- Check the LRSB top and bottom soot blower running condition.
- Check the rotor main and support bearing temperature.
- Check the rotor cooling fan & LLF fan air pressure.
- Check the GGH rotor running condition and feedback.
- Check any abnormal noise and vibration in above equipment’s.
GGH Stop procedure:
- Ensure the booster fan is stopped. Then stop the low leakage fan.
- Start the soot blowing sequence controller keep GGH rotating for 1h turn off the on/off switch for alarm system
- Stop the main and auxiliary motors
- Close the sealing valves for soot blower
- Inlet and outlet damper of FGD closed condition, absorber vent in open condition
Corrosion Resistance:
In most GGH applications, the risk of condensation and corrosion is much greater. The GGH operates at lower temperature than Air Pre heater (APH). This means that the GGH is exposed to fly ash and acid condensing on the untreated side and to a combination of water droplets (often with high chlorine content), Unreacted limestone and the remaining SO2 on the clean gas side.
Heating Elements (Baskets):
Removal of GGH Baskets:
- Maintenance opening is to be provided where removal and installation of GGH baskets is convenient (remove insulation and cut open a hole at a suitable location)
- Install a channel Beam from inside to Outside of GGH and install Hoist
- Before carrying out any welding activities on the rotor, it is necessary to make sure that the rotor is properly earthed to avoid any possible damage to the GGH bearing
- Hook up the GGH baskets and remove the baskets from compartments in the sequence of A to G and move the baskets outside through the maintenance opening
- Rotate rotor to reach next compartment and repeat the above same procedure
- All old GGH elements shall be removed before installation of new ones to prevent clogging.All the accumulated dust and miscellaneous materials on the rotor and cold-end & hot-end sector plates shall be thoroughly cleaned off.
- Welding of sector plates shall be checked, if loose welding point is found, must apply welding and buffing again.
- Bearing verticality shall be within the required range (0.40 mm/meter)
Installation of GGH Baskets:
- Move the GGH baskets to be installed through the maintenance opening to the inside of GGH.
- Baskets installation should start with A, and to B, and to C, and to D, and to E1 & E2, and to F1 & F2, and to G1 & G2 installation is complete
- Rotor balancing is very important criteria we have to follow while installation of baskets.
- Levelness adjustment after completion of all GGH baskets installation to be carried out
- Installation of All Apex Seal, Axial Seal and Bypass Seals to be carried out
Key Note:
- If you insist that installation be carried out after partial removal of old GGH element, then the installed GGH modules should be properly covered so that objects or dust may not fall into the GGH element plates and form clogging.
- Walking and stacking of any materials on the newly installed GGH elements is strictly prohibited.
- Collision and hitting of GGH elements is also prohibited.